
Power Grid Bremen/Manhattan Expansion
Back-Orders are in-stock products with our distributors, they will usually be ready to ship after 10 business days.
Tax included.
Worldwide shipping.
Rates calculated at checkout.
Perth, WA Online Order Collections Available

Power Grid Bremen/Manhattan Expansion
Titan Pop Culture - Via Appointment
61 Guadalupe Drive
Ballajura WA 6066
Australia
Flexable Collections / Residential Address
Contact Mon-Fri - 12-6pm
SMS: +61421845213Bremen: The fight of the electric power companies in Bremen for the most customers is particularly tough and fast. Nuclear power plants are not used to supply electricity in Bremen and expensive resources are scarce. Compared to all other game boards Bremen does not have classic connecting costs between cities, but instead flat district costs. Additionally, several districts are so small, that they are limited to two spaces for networks and afterward do not
Manhattan: Manhattan has a giant demand for electric power but does not have much space for the necessary networks. Thus, the electric power companies fight nonstop for the cheapest building costs all over Manhattan. This map only offers a single huge area and the game only runs in Step 1 until the end of the game.
This item is a BACK-ORDER, we will order this item in for you.
Back-Orders are products that are shown to be In-Stock with our distributors.
When you place an order on our website we will order the product with the distributor.
Your item will arrive in our following order from the distributor around 14 days after your order is placed, please note sometimes there may be a delay caused by transit or distributor dispatch times. As soon as your order is complete your item/s will ship out to you or be ready for collection depending on your method chosen at checkout.
